VATFLOW · FCA programs

Issue & manage RDY times

Pick what you are working. Each path covers only what you need for Flow Constrained Area (FCA) releases — not airport arrival-rate programs. Start with Reading an FCA strip if the times are new to you.

Share this page: https://vatflow.io/tower-rdy-guide.html

Reading an FCA strip

Same strip layout in FCA Builder; IDST shows Flights to Work tables instead of strips. Example: an airborne aircraft locked to the line, then a ground departure waiting for RDY.

1

Sequence # / drag handle

Order in this FCA. Editors can drag to force MANUAL sequencing. Everyone else treats this as the current planned order.

2

Phase badge — AIR / CFR / RLSD

AIR = already flying (crossing time is fixed). CFR = ground, advisory only — no slot owned yet. RLSD = you pressed RDY; wheels-up is frozen.

3

Callsign & type

Who the strip is. Type is informational only.

4

Route · altitude · speed · nm to line

Dep → dest, FL, and groundspeed (or depart if still on the ground). nm to line is distance remaining to the FCA crossing along the filed route.

5

cross HHMMZ (ground only)

Scheduled crossing time at the FCA line (CTA). Wheels-up is backed out from this using estimated transit. On AIR strips the big time on the right is the crossing time, so “cross …” is not repeated on the info line.

6

Cyan gap line

AIR: spacing to the line or behind the previous airborne aircraft (nm).
Ground: minutes behind the previous aircraft at the crossing (here EVA585 is ~57.7 min after ACA503’s 1545Z crossing → cross 1642Z).

7

Big time (right)

AIR → crossing time (ACA503 1545Z).
Ground (Builder) → proposed wheels-up (EVA585 1550Z) so they make their cross time. In IDST the CFR column stays empty until RDY so you do not read an advisory number to the pilot by mistake.

8

Status under the big time

on time / air +… for airborne. no delay / hold +… / released for ground. Hold means metering is pushing wheels-up later than “ready now.”

What the times mean (quick ref)

Crossing / CTA When the aircraft is scheduled across the FCA line. Airborne: fixed by ETA. Ground: the slot the release is trying to meet (cross 1642Z on EVA585).
Wheels-up / RDY When they should roll so transit time hits the crossing. Frozen only after RDY. Until then it is a projection (Builder may show it; IDST hides it until RDY).
Gap (min / nm) Spacing behind the previous aircraft in the sequence — at the line for ground (minutes), or in trail for air (nm).
nm to line How far they still are from the FCA along the filed route. Not the same as airport distance.
Do not read advisory wheels-up to the pilot

On a CFR (not yet RLSD) strip, the big time in Builder is a proposal. Issue RDY from IDST (or FCA Overview / Builder) before you clear a wheels-up time. Airport TMU does not issue a time.

What are you working?

Tools